Work‑train planning, from first draft to closeout.

Weekend closures planned end to end: consists, track machines, operators, routing, materials and readiness certificates, each tracked against the T‑week milestones.

BuiltLinkedTracks is our platform for work‑train planning.

Workflows

What LinkedTracks covers

  • Closure planning

    Build each closure as a work block with trains, machines and crews, tracked against T-week milestones.

  • Fleet allocation

    Allocate locomotives, cars and track machines across closures and resolve clashes before loading.

  • Operator competencies

    Book only qualified operators and verify their cards at the yard.

  • Readiness approvals

    Sign consists, routing and materials by version, and certify every car before departure.

LinkedTracks

Every closure tracked from T‑42 weeks to closeout.

LinkedTracks puts RoomAMD's capabilities together around one workflow: work-train planning for rail construction. It is planning, coordination and documentation software. It doesn't control dispatch, signalling, train movement or machinery.

  1. T-42

    Draft plan

  2. T-22

    Handover

  3. T-12

    Consist signed

  4. T-8

    Machine routing

  5. T-6

    Train routing

  6. T-4

    Materials

  7. T-2/1

    Certified loaded

  8. T+1

    Closeout

Vocabulary

It speaks your language.

The underlying records stay the same. The screens, labels and rules use the words your teams already use, so nobody has to learn ours.

Job
RailWork block / closure
Resource
RailLocomotive, car, track machine
Qualification
RailMachine ticket