SolutionsRail and transit
Work‑train planning, from first draft to closeout.
Weekend closures planned end to end: consists, track machines, operators, routing, materials and readiness certificates, each tracked against the T‑week milestones.
BuiltLinkedTracks is our platform for work‑train planning.
Workflows
What LinkedTracks covers
Closure planning
Build each closure as a work block with trains, machines and crews, tracked against T-week milestones.
Fleet allocation
Allocate locomotives, cars and track machines across closures and resolve clashes before loading.
Operator competencies
Book only qualified operators and verify their cards at the yard.
Readiness approvals
Sign consists, routing and materials by version, and certify every car before departure.
LinkedTracks
Every closure tracked from T‑42 weeks to closeout.
LinkedTracks puts RoomAMD's capabilities together around one workflow: work-train planning for rail construction. It is planning, coordination and documentation software. It doesn't control dispatch, signalling, train movement or machinery.
T-42
Draft plan
T-22
Handover
T-12
Consist signed
T-8
Machine routing
T-6
Train routing
T-4
Materials
T-2/1
Certified loaded
T+1
Closeout
Vocabulary
It speaks your language.
The underlying records stay the same. The screens, labels and rules use the words your teams already use, so nobody has to learn ours.
- Job
- RailWork block / closure
- Resource
- RailLocomotive, car, track machine
- Qualification
- RailMachine ticket
| In RoomAMD | In rail and transit |
|---|---|
| Job | Work block / closure |
| Resource | Locomotive, car, track machine |
| Qualification | Machine ticket |
See LinkedTracks with your programme in mind.
We'll walk through the lifecycle, the fleet and the sign-offs, and show how they'd fit how your closures run today.