RoomAMD Projects
Project control, start to finish.
Project control from start to finish: milestones that complete when the facts say so, approvals tied to the exact version that was signed, and a lifecycle that shows what a delay touches.
Built by RoomAMDBuilt in LinkedTracks
Build something like this
The problem
What goes wrong without it
- Plans and reality drift apart
- The schedule says a milestone is done because someone ticked a box, not because the work is ready.
- Dates without resources
- A timeline shows tasks but not the machine, crew or approval each one depends on.
- Late news
- Delays are discovered at the deadline instead of the moment they start.
Live demo
Delay one task. See what it touches.
One job, part by part, with the operator, the booking and the approval from the other products attached. Drag the delay: the certificate moves past its deadline, the milestone turns red and readiness drops before anyone asks.
- T-42
- T-22
- T-12
- T-8
- T-6
- T-4
- T-2/1
- T+1
T-2/1 · every train certified loaded by Fri, Mar 5, 2027 · 23:59
Loading · ballast cars
On plan. Certification ends Fri, Mar 5, 2027 · 20:00, four hours before the deadline.
Attached to this weekend
4 of 5 stages done · Departure Board opens at T‑2
Interactive demo on invented data. Nothing here connects to a live system.
Milestones that complete themselves
Done means the facts are true, not that a box was ticked.
Every job runs against the same lifecycle, counted back in weeks from the work date. Each milestone completes on its own when its conditions are met: signed, booked, certified. Document control tells you what was filed. Project control tells you whether the job is ready. Templates are configurable, so the same idea fits other kinds of project.
T-42
Draft plan
Every train has a consist and a route; requests filed.
T-22
Handover
Handed over to the delivery team.
T-12
Consist signed
Consist and machines signed by both leads.
T-8
Machine routing
Machine routing signed; track access confirmed.
T-6
Train routing
Train routing signed; timings received.
T-4
Materials
Materials signed by both leads.
T-2/1
Certified loaded
Every train certified loaded before departure.
T+1
Closeout
Every train back home.
Before the workAfter the work
Live demo
Approvals that know what they signed.
Two leads sign version 2 of the work package. A machine is swapped. The package becomes version 3 and both signatures go back to review until each lead approves again. Nothing is approved by accident, and nothing that was signed is lost: the history keeps every version and every signature.
Consist and machines LO-21 · BC-118 · BC-121 · BR-04 · TM-12 · ST-03
4 changes · showhide
- changed by Aisha Mensah · Feb 26, 2027 · 09:00v2 · Equipment lead approved v2
- changed by Jun Park · Feb 23, 2027 · 09:00v2 · Corridor lead approved v2
- changed by Priya Raman · Feb 20, 2027 · 09:00v2 · Added ballast car BC-121
- changed by Priya Raman · Feb 17, 2027 · 09:00v1 · Submitted: consist and machines for Weekend 14
Interactive demo on invented data. Nothing here connects to a live system.
Capabilities
What Projects does
- Self-ticking milestones
- A milestone completes when its facts are true (signed, booked, certified), not when a box is ticked.
- Lifecycle templates
- Configurable task templates measured back from the work date, with each task due on a set week.
- Version-tied signatures
- Each approval records the version it signed. A later change bumps the version and the old signature shows as out of date.
- Two-person sign-off
- Items can require two different people to sign the same version. One person can't hold both signatures.
- Locking and reopening
- A final lock freezes the package. Changing a locked item means reopening it, which resets its signatures.
- Change history
- Field-level history is recorded by the database: before and after, who, and when.
- Readiness certificates
- Per-item checks with photos and two signatures, producing a PDF certificate. Editing after signing voids it.
- Stages and readiness
- Stages and steps roll up into a readiness percentage. Overdue is red, due soon is amber.
- Calendar views
- Agenda, week, month and year views of the work, with conflicts marked.
- Resource-aware timelines
- Each work item shows the people, equipment and approvals attached to it.
- Who holds the next step
- A tracker shows which person or team owns the next action on every job.
Fact-driven milestones, templates, stages, version-tied dual sign-off, locking and readiness certificates are built in LinkedTracks. Gantt-style dependency editing and project-file import are not built and not claimed.
Where it fits
Use cases
- Rail and transitTrack every closure from first draft to closeout against fixed T-week milestones.
- ConstructionTie project milestones to permits, crews and plant availability.
- InfrastructureCoordinate many parallel work packages with shared resources.
Connected
Works with
- RoomAMD IdentitySignatories are verified people with known roles.
- RoomAMD WorkforceAssigned people show on the timeline beside the work.
- RoomAMD FleetEquipment bookings appear on the work items they serve; changing one marks the approval for review.
See Projects with your own operation in mind.
We'll walk through how it would fit your people, assets and processes, and what configuration it would need.